Roy J. Carver Pavilion

Building Information

Space Information

Building Number

0359

Building Name

Roy J. Carver Pavilion

Building Address

200 Hawkins Drive
Iowa City, IA 52242

Building Abbreviation

RCP

Gross Square Foot

519,548

Year Built

1975

Ownership

Owned

Named Building

Carver, Roy J.

Accessibility Map

MAP

Accessibility Info

INFO

 

Contact Information

Building Coordinator- Primary

William  Mielnik

 

Building Coordinator - Alternate

 

 

Area Manager

 
 

Current Building Projects (> $25,000)

Project Number

        Project Title

0005701

Patient & Visitor Service Center

0005701

Patient & Visitor Service Center

0030201

Inpatient Unit Improvements

0032301

Urology Clinic Expansion

0032401

Radiant Ceiling Piping Revisions

0069601

Sleep Clinic Move from RCP to CDD

0093401

Neurology Move to Sleep Lab Space

0093501

Surgery - Renovate Pediatric Surgery CHI Faculty Offices

0093701

Soiled and Clean Utility Room - 6 RCP - CMS Review

0093901

Roof Recover Group 3

0100201

Replace Adult Cardiac Cath Lab #3

0101601

Rework Gift Shop Storeroom into Offices

0123801

Develop Critical Care Unit on Level 1

0123901

Expand MICU to 5 RCP

0212601

Anesthesia Space Expansion

0246701

Electrical Switchboard 1-4 Interconnection

0262801

Franken Conference Room

0265001

Electrical Switchboard 2-3 Interconnection

0274901

Front Entrance Temperature Controls

0318701

RCP - Internal Emergency Notification System

0318801

RCP - Fire Alarm System Upgrade

0341201

RCP  Administrative Office Suite Expansion

0362601

RCP - UIHC Administrative Office Suite Remodeling

0367301

RCP - 2RCE Renovation

0367302

2RCE Renovation- Ceiling Replacement

0370901

RCP - Department of Neurology Renovation

0374201

RCP - MOR Suite Patient Pre/Post Operative Facility Expansion

0374401

RCP  Nuclear Cardiology Camera Installation

0374501

UI Heart & Vascular Clinic Patient Throughput Enhancements

0375001

RCP - Psychiatric Resources and Observation Center

0375501

RCP - Adult Blood & Marrow Transplant Unit facility Enhancements

0379101

RCP - Safety & Security Operations Center Relocation and Upgrade

0419501

RCP - 2nd Ceiling Replacement

0421001

RCP - Discharge Pharmacy Development

0424401

RCP - Installation of Playcourt on Carver Pavilion Patio

0430501

RCP - Electrical Transfer Switch Replacement

0430601

RCP - 8th Floor Rooftop Terrace Enhancements

0432801

RCP - Emergency Department Expansion

0434301

RCP - Emergency Treatment Center Annex

0443701

RCP - Pathology Core Lab Utilities

0445301

Renovation of ECHO and Support Space on Level 4 Carver Pavilion

0451701

RCP - Cath Lab 2 Equipment Installation

0458101

RCP - Administrative Office Modification

0492501

RCP - Cardiac Catheterization Lab#1 Equipment Replacement

0508401

Critical AHU Upgrades - Carver AHU #11

0524401

Emergency Department Security Station Development

0536101

MOR Equipment Storage Facility and Renovation of MICU Family Waiting Space on Level 5 RCP

0614101

Level 6 Family Lounge Dev and Investigational Drug Pharm Reloc

0614801

Securement of Stairwell Access - Inpatient Units

0615401

Main Lobby Entry Heating System Level 1

0663101

4RCP Convert Storage Rm 4070 to Inpatient Rm

0668801

Reconfiguration of Emergency Department Registration and Triage

0682001

Cath Lab 4 Renovation

0682401

Level 1 RCP Emergency Department CT Scanner Replacement

0683301

Digestive Disease Clinic Exam Room Expansion

0690402

Inpatient Psychiatry Expansion and Renovation Demolition

0710201

Convert 2 ED Rooms to Exam Rooms

0745701

MICU Flooring Replacement

0749901

Fire Panel Replacement and Fiber Optic Cable Connection to the AirCare Hanger


ENERGY CONSUMPTION

CURRENT
Real Time Energy Use



HISTORICAL (General Fund)

Historical Energy Usage