BID RESULTS
| Project Title | Job # | Project Manager | Bid Date | Bid Results | Award Date | Awarded To |
|---|---|---|---|---|---|---|
| Campus - Fire Safety Improvements | 0086001 |
5/13/08 |
Pending |
Pending |
||
| UIHC - Central Nursing Office HVAC Upgrade | 0113201 008-053 |
5/13/08 |
Pending |
Pending |
||
| Slater Hall - Replace South Entrance Steps and Add ADA Compliant Ramp | 0099601 |
5/13/08 |
Pending |
Pending |
||
| Oakdale Hall - Replace Condensing Unit for H Building | 0097301 |
5/13/08 |
Pending |
Pending |
||
English-Philosophy Building - Replace Cooling Tower Roof Section |
0087701 |
5/08/08 |
5/9/08 |
Cedar Service |
||
| Biology Building - Renovate Rooms 321, 331, 331A, 331B, 335 & 335A | 0098401 |
5/08/08 |
5/9/08 |
|||
| President's Residence - Install Elevator | 0099801 |
5/07/08 |
Pending |
Pending |
||
| Parking - Lot 48 Reconstruction | 0078401 |
5/07/08 |
Pending |
|||
UIHC - Pediatric Intensive Care Unit On-Call Rooms |
0095501 207-040 |
5/07/08 |
5/12/08 |
|||
| Hillcrest - Replace Roof on North Sundeck | 0083001 |
5/06/08 |
5/12/08 |
|||
| UIHC - Pediatric Cath Lab Upgrade - L2 JPP | 0110901 208-008 |
Joe Hentges |
5/06/08 |
5/6/08 |
||
| Jessup Hall - Install Emergency Gnerator | 0101301 |
5/06/08 |
To be re-bid 05/20/08 |
|||
| Burge Hall - Replace Roofs on Third and Fourth Houses | 0082901 |
5/01/08 |
5/5/08 |
Academy Roofing |
||
| Oakdale Northlawn - Raze House | 0097401 |
4/29/08 |
Pending |
Pending |
||
| 111 Church Street - Convert to Writer's House | 0075001 |
4/24/08 |
4/25/08 |
Apex |
||
Power Plant - Boilers 7 & 8 Stack Support Improvements |
0067601 |
4/23/08 |
04/25/08 |
Calacci Construction Co., Inc. |
||
| UIHC: Interventional Operating Rooms with Angiography Systems | 0073601 206-057 |
UIHC |
4/23/08 |
4/30/08 |
Miron |
|
| Field House- Replace Roof Sections 7 and 13 | 0076201 |
4/22/08 |
5/5/08 |
Academy Roofing |
||
Iowa Memorial Union Ramp - Renovate Office Space |
0079501 |
4/17/08 |
4/17/08 |
Frantz Const. |
||
| Controlled Access and CCTV Monitoring System, Phase 2 | 0020601 |
4/16/08 |
4/17/08 |
Tri-City Electric |
||
| UIHC: Pediatric Intensive Care Unit Expansion | 0095501 207-040 |
UIHC |
4/16/08 |
4/30/08 |
City Const. |
|
| College of Public Health Academic Building- Bid Package 1- Utility Relocation, Site Preparation and Building Demolition | 0025502 |
4/10/08 |
4/30/08 |
Carter & Assoc. |
||
| Biology Building East- Repair Greenhouse | 0078101 |
4/10/08 |
Pending |
Pending |
||
| UIHC: Ambulatory Surgery Center - Bronchoscopy Recovery Space | 0008301 203-078H |
UIHC |
4/09/08 |
4/16/08 |
McComas-Lacina |
|
| Cretzmeyer Track and Field Complex Renovation | 0089201 |
4/09/08 |
4/18/08 |
McComas- Lacina |
||
| Medical Education Building- Replace Wood Windows | 0076002 |
4/08/08 |
4/30/08 |
McComas-Lacina |
||
| UIHC: Expansion of GI Recovery and Procedure Rooms | 0101801 207-048 |
UIHC |
4/8/08 |
4/25/08 |
City Const. |
|
| Art Building - Phase 2 Renovation and Landscaping | 0012101 |
4/03/08 |
4/21/08 |
McComas- Lacina |
||
| UIHC: General Hospital Steam Trap Replacement | 0093801 207-070 |
UIHC |
3/27/08 |
4/25/08 |
Kriz Piping & Welding |
|
| Halsey Hall - Replace Wooden Windows | 0077102 |
3/27/08 |
Pending |
Pending |
||
Biology Building - Renovate Rooms 322, 324 324A |
0096601 |
3/27/08 |
3/28/08 |
Apex |
||
| Hospital Parking Ramp #2- Repair Office Roof | 0089201 |
3/27/08 |
05/08/08 |
Dryspace, Inc. |
||
| UIHC: Phased Flooring and Finsihes -PH 2 | 0095101 207-055 |
UIHC |
3/26/08 |
4/2/08 |
McComas-Lacina |
|
| Phillips Hall - New Flooring in General Assignment Classrooms | 0090002 |
3/26/08 |
3/27/08 |
Apple & Horn Tile Co. |
||
| UIHC: Roof Recover Group #3 | 0093901 207-073 |
UIHC |
3/25/08 |
4/22/08 |
Advanced Builders |
|
| UIHC: Roy Carver Pavilion (RCP)-Public Restroom Upgrade | 0098101 207-043 |
UIHC |
3/20/08 |
3/27/08 |
Wolfe Contracting |
|
Parking Ramps and Lots - Arena Parking Lot -Curb Replacement 2008 |
0082401 |
3/20/08 |
3/21/08 |
All American Concrete, Inc. |
||
| Chemistry Building Renovation Phase 2 | 0019001 |
3/18/08 |
4/30/08 |
Cardinal |
||
| Rowing Team Boat House | 0037001 |
3/13/08 |
4/25/08 |
Miron |
||
| College of Public Health-Site Preparation: Bid Package #2 - Steam and Condensate Connections | 0025503 |
Steve Buckman-PM Charles Saxton-CM |
3/14/08 |
3/24/08 |
American Piping Group, Inc. |
|
| College of Public Health-Site Preparation: Bid Package #1 - Chilled Water Connections | 0025503 |
Steve Buckman-PM Charles Saxton-CM |
3/14/08 |
3/19/08 |
Carter and Associates, Inc. |
|
| UIHC: PFP Data Center - Uninterruptible Power Expansion | 0100101 207-039 |
UIHC |
3/11/08 |
4/2/08 |
Hawkeye Electric |
|
| Utility System-Building Data Acquisition Cabling | 0083301 |
3/11/08 |
3/13/08 |
Munson Electric |
||
| North Hall-Renovate Rooms 421 and 422 | 0089301 |
3/04/08 |
3/10/08 |
Apex Construction Co.,Inc. |
||
| UIHC: Inpatient Isolation Room Exhaust Upgrade | 0092701 207-045 |
UIHC |
02/20/08 |
3/20/08 |
Universal Climate Control |
|
| Bowen Science Building (BSB)-Anatomy and Cell Biology Cores 1-400 and 1-600 | 0064701 |
02/14/08 |
2/25/08 |
Apex Construction Co., Inc. |
||
| Medical Research Facility (MRF)-Renovate Rooms 357, 358, 370, 371, 374, 375, 376, 378 | 0094201 |
02/14/08 |
2/18/08 |
DeJear Enterprises, LLC |
||
| North Hall-Renovations for Art Program | 0012103 |
02/13/08 |
2/25/08 |
Apex Construction Co., Inc. |
||
| Hospital Parking Ramp #3-Renovate Office Space | 0074701 |
02/12/08 |
2/18/08 |
BMW |
||
| Rienow Hall-Renovate Restrooms Phase 3 | 0082801 |
02/05/08 |
2/06/08 |
McComas-Lacina Construction LC |
||
| Dental Science Building (DSB)-Modernize South Freight Elevator | 0076101 |
1/31/08 |
Bid Tabulation (.pdf) |
2/04/08 |
O'Keefe Elevator Co., Inc. |
|
| UIHC: MRI Center Renovation-Phase 3 | 0093201 207-047 |
UIHC |
1/31/08 |
2/05/08 |
McComas-Lacina Construction LC |
|
| Burge Hall-Renovate Restrooms Phase 5 | 0082701 |
01/24/08 |
1/28/08 |
McComas-Lacina Construction LC |
||
| Extend Southeast Utilities-Phase 2 | 0050402 |
01/23/08 |
1/30/08 |
American Piping Group, Inc. |
||
| UIHC: Domestic Water Building Backflow Preventers | 0093001 207-071 |
UIHC |
01/22/08 |
2/29/08 |
Day Mechanical |
|
| UIHC: Carver Pavilion-Domestic Water Riser Connections | 0092901 207-069 |
UIHC |
01/22/08 |
1/24/08 |
Prime Mechanical, Inc. |
|
| CCOM-Campus-Install Donor Recognition Signage | 0088901 |
01/17/08 |
1/18/08 |
Sign Productions, Inc. |
||
| University of Iowa Power Plant-Coal Bunker Air Cannon Piping Replacement | 0084901 |
01/16/08 |
1/17/08 |
Ryan and Associates, Inc. |
||
| UIHC: South Wing Shower-Restroom Repairs | 0092801 207-041 |
UIHC |
01/16/08 |
1/22/08 |
Selzer-Werderitsch Associates |
|
| UIHC: Boyd Tower-Air Handling Unit 4 Replacement | 0087401 207-044 |
UIHC |
01/15/08 |
Bid Tabulation (.pdf) |
2/11/08 |
McComas-Lacina Construction LC |
South Quadrangle-Renovate Rooms 209 and 210 |
0091301 |
Kris Kluseman |
12/20/07 |
12/21/07 |
Apex Construction Co. |
|
UIHC: Phased Flooring and Finishes Replacement-Atrium Dining Room and Conference Center |
0096001 207-057 |
UIHC |
12/20/07 |
12/31/07 |
McComas-Lacina Construction LC |
|
Engineering Research Facility (ERF)-Connect to Campus Chilled Water |
0084301 |
Steve Buckman |
12/19/07 |
1/14/08 |
Modern Piping, Inc. |
|
UIHC: 4 Boyd Tower Conversion to Training Facilities and Offices |
0095201 207-058 |
UIHC |
12/19/07 |
12/26/07 |
Aanestad Construction |
|
University Hygienic Laboratory |
0003901 |
12/13/07 |
Bid Tabulation (.pdf) |
1/24/08 |
Knutson Construction Services Midwest, Inc. |