NOTE TO DESIGN PROFESSIONALS
Division 00 and 01 specification sections have been modified to improve the organization of material and eliminate redundancy within the project manual. Several sections have been removed, as pertinent information is covered elsewhere in the project manual. For a complete list of changes to the specification sections, click here.
For word templates and .pdf files, please download the following ZIP files:
Division 00 ZIP File (Word and .pdf documents)
Division 01 ZIP File (Word documents)
DIVISION 00 MASTERS Instructions for the preparation of Construction Documents can be found in the Design Standards and Procedures. |
||
| DIVISION 00 CURRENT EDITIONS (Cheat Sheet) | ||
| 00 01 01 | TITLE PAGE | May 2008 |
| 00 01 07 | SEALS & SIGNATURES | March 2008 |
| 00 01 10 | TABLE OF CONTENTS | June 2008 |
00 11 13 |
ADVERTISEMENT FOR BIDS Note: Please email Ad For Bids to PD&C, 3 to 4 weeks prior to bid. | May 2008 |
| 00 21 13 | INSTRUCTIONS TO BIDDERS | June 2008 |
| 00 41 13 | FORM OF BID | May 2008 |
| 00 43 13 | BID BOND | March 2008 |
| 00 43 25 | SUBSTITUTION REQUEST FORM | March 2008 |
| 00 43 36 | SUBCONTRACTOR LIST | March 2008 |
| 00 45 14 | TELECOMMUNICATION QUALIFICATION REQUIREMENTS Note: If this section is required, please add 00 45 14 to the Table of Contents. | March 2008 |
| 00 45 36 | EEO DATA REPORTING FORM | March 2008 |
| 00 45 37 | CERTIFICATE OF REPORTING | March 2008 |
| 00 45 40 | TSB PARTICIPATION FORM | March 2008 |
| 00 72 13 | UNIFORM GENERAL CONDITIONS OF THE CONTRACT |
March 2008 |
| 00 73 13 | SUPPLEMENTARY CONDITIONS | May 2008 |
| 00 74 13 | SPECIAL CONDITIONS | June 2008 |
| DIVISION COVER PAGES: Divisions 01 through 49 | ||
|
|
||
| DIVISION 01 CURRENT EDITIONS (Cheat Sheet) | ||
| 01 33 23 | SUBMITTALS | March 2008 |
| 01 77 19 | CONTRACT CLOSEOUT | March 2008 |
| 01 78 23 | OPERATION AND MAINTENANCE DATA | March 2008 |
| 01 78 39 | PROJECT RECORD DOCUMENTS | March 2008 |
| 01 91 13 | COMMISSIONING | March 2008 |
Addendum Standard Format (Word .doc)
Informal Bid Specification Sections coming soon!
