MARCH- JUNE 2008 CHANGES
Sections listed below in black are to be edited by the Design Professional and reviewed by the Owner’s Project Manager prior to bid.
Documents listed below in blue have been removed from the project manual though some are still referenced in the project manual and available for review on the PD&C web site.
Documents listed below in green are not to be edited as they are FM master documents and only need to be printed in the final bid set of documents unless otherwise requested by the Owner’s Project Manager.
General Specification font (size): Arial (9) Division 00Title Page May 2008 Edition – Word document available online. Format blanks to be edited by Design Professional and approved by Owner’s Project Manager. 00 01 07Seals & Signatures March 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. 00 01 10Table of Contents June 2008 Edition - Numbering corrections. May 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager.
00 01 15List of Drawing Sheets This section was removed. The list of drawing sheets is now to be placed on the cover sheet of the project drawing set. 00 11 13Advertisement for Bids May 2008 Edition – Word document available online. Format blanks to be edited by Design Professional and approved by Owner’s Project Manager.
**Document to be emailed to Owner’s Project Manager and Facilities Management Design and Construction 3 to 4 weeks prior to bid.
00 21 13Instructions to Bidders June 2008 Edition, March 2008 Edition – PDF document available online. Master Document not to be edited.
**Insert into project manual for bid set only.
00 41 13Form of Bid May 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. 00 41 14Form of Bid with Alternates This section has been removed. The form of bid, section 00 41 13 is to be used for all bids and modified as needed for alternates, unit prices and allowances. 00 43 13Bid Bond March 2008 Edition – PDF document available online. Master Document not to be edited. 00 43 25Substitution Request Form March 2008 Edition – PDF document available online. Master Document not to be edited. 00 43 36Subcontractor List March 2008 Edition – PDF document available online. Master Document not to be edited. 00 45 14Telecommunication Qualification Reqs March 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. 00 45 36EEO Data Reporting Form March 2008 Edition – PDF document available online. Master Document not to be edited. 00 45 37Certificate of Reporting Form March 2008 Edition – PDF document available online. Master Document not to be edited. 00 45 40TSB Participation Form March 2008 Edition – PDF document available online. Master Document not to be edited. 00 52 13Form of Agreement between Contractor & Owner: This section has been removed. The form is referenced in the Supplementary Conditions and the form may be found on the PD&C web site, http://www.facilities.uiowa.edu/dcs/dcscontract101.htm 00 61 13Contract Performance & Payment Bond Form This section has been removed. The form is referenced in the Supplementary Conditions and the form may be found on the PD&C web site, http://www.facilities.uiowa.edu/dcs/dcscontract101.htm 00 62 20Hot Work Notice This section has been removed. The form is referenced in the Supplementary Conditions and the form may be found on the PD&C web site, http://www.facilities.uiowa.edu/dcs/dcscontract101.htm 00 62 33Contractor’s Hazardous Chemicals ID Form This section has been removed. The form is referenced in the Supplementary Conditions and the form may be found on the PD&C web site, http://www.facilities.uiowa.edu/dcs/dcscontract101.htm 00 65 20TSB Final Payment Reporting Form This section has been removed. The form is referenced in the Supplementary Conditions and the form may be found on the PD&C web site, http://www.facilities.uiowa.edu/dcs/dcscontract101.htm 00 72 13Uniform General Conditions March 2008 Edition – PDF document available online. Master Document not to be edited. 00 73 13Supplementary Conditions May 2008 Edition – PDF document available online. Master Document not to be edited. Changes within this document. 00 74 13Special Conditions June 2008 Edition, May 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. Changes within this document.
September 2008 Edition, - Added 00 74 13 7.a.1, 9.6 requiring that bidders secure a UI vendor numbering from UI Purchasing Dept. prior to bidding.
Division 01 01 11 13Summary of Work This section has been removed. The summary of work is to be found in the Special Conditions now. 01 29 73Schedule of Values This section has been removed. This information is now referenced in the Supplementary Conditions. 01 23 13Alternates This section has been removed. If needed add descriptions to Special Conditions. If we’re listing in addition to the Form of Bid, we need to be cognizant that the verbiage in both locations is an identical match. Recommend that in lieu of adding to Special Conditions that a separate Section be added labeled “Alternates.” 01 29 76Applications for Payment This section has been removed. This information is now referenced in the Supplementary Conditions. 01 31 19Project Meetings This section has been removed. This information is now referenced in the Supplementary Conditions.
01 33 23Submittals March 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. Submittal Log to be filled out by DP prior to bidding. 01 50 13Construction Facilities & Temporary Controls This section has been removed. This information is now referenced in the Supplementary Conditions. 01 50 13 - AConstruction Fence for Tree Protection (CRZ) This section has been removed. Information is now referenced in the Special Conditions. 01 50 13 - BConstruction Site Fencing Detail – Solid Wood This section has been removed. Information is now referenced in the Special Conditions. 01 50 13 - CConstruction Site Fencing Detail – Plastic Mesh This section has been removed. Information is now referenced in the Special Conditions. 01 74 23Cleaning This section has been removed. This information is now referenced in the Supplementary Conditions. 01 77 19Contract Closeout March 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. Contract Closeout Log to be filled out by DP prior to bidding. 01 78 23Operation and Maintenance Data March 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. Operating Instructions and Service Manual Log to be filled out by DP prior to bidding. 01 78 39Record Documents March 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. 01 79 13Systems Demonstration This section has been removed. This information is now referenced in the Supplementary Conditions. 01 91 13Commissioning March 2008 Edition – Word document available online. Document to be edited by Design Professional and approved by Owner’s Project Manager. Owner provided Commissioning Checklist documentation to be included at the end of this section prior to bidding. Click here for new Facilities Management Specification Documents