Iowa Advanced Technology Laboratories

Iowa Advanced Technology Laboratories

Iowa Advanced Technology Laboratories

Project Number

Description

0085701

Renovate Rooms 286 and 380

 

This project consists of the interior renovation of Laboratory Rooms 286 and 380 of the Iowa Advanced Technologies Laboratories (IATL). The rooms will be renovated to accommodate the functions that currently exist in Room E124 of the Chemistry Building.

   

0132101

Temporary Flood Recovery

 

Provide for the flood restoration needs and develop bid packages to bring this building back on line.

   

0153802

Flood Recovery of Clean Room in E151A

 

Temporary flood recovery of Clean Room located in room E151A, IATL.

   

0153804

Install New Evacuation Routes

 

Create two new routes to expedite evacuation of lab equipment in the event of a future evacuation order.

   

0177601

Install Perimeter Access Control

 

Install access control on exterior doors.

   

0198601

Flood Mitigation and Permanent Recovery

 

Perform permanent recovery and mitigation for IATL. IATL is an example of the early work of internationally known architect - Frank Gehry. Therefore, the building has historical and signature status. Modifications to the facility should preserve the integrity of the original design whenever possible.

   

0198602

Bid Savings

 

   

0203701

HVAC Testing and Balancing

 

Testing and balancing of IATL HVAC system for both offices and labs.

   

0277501

Flood Recovery of Casework

 

Replace flood damaged casework with permanent casework in seventeen first floor labs.

   

0297801

Heat Wheel Recovery

 

Installation of a Heat Recovery Unit within the exhaust airstream to save significant energy.

   

0302001

Install 1st Floor Open Cubicle Lighting

 

Project consists of providing indirect lighting and associated wiring to the cubicles located in the first floor open office area.

   

0339001

Install New MBE in Room E151

 

Perform modifications to room E151, IATL to allow installation of user provided MBE machine.

   

0383101

Reconfigure Rooms 170 and 174

 

Expansion of the microfabrication laboratory into room #174.

   

0405601

Replace Roof Section B-1

 

Replace ballasted roof section B-1 at IATL.

   

0456401

Install Intlvac and ALD in Microfabrication Room 174

 

Install utility connections to two pieces of flood recovery equipment.

   

0462401

Replace Modular Cleanroom in Room 172

 

Room reconfiguration for microfabrication expansion of room 172 in IATL.

   

0502101

Extend Building Services to Room 174

 

Add utilities for new tool.

   

0544801

Building C Maintenance

 

This project replaces the insulation and nailboard on the walls and roof of Build C of the Iowa Advanced Technology Laboratories.

   

0591201

Install Wet-Bench in Room 170

 

Provide estimate to install a used wet bench provided by user.

   

0599901

Repair Sheetrock in Atrium

 

Repair several areas of drywall in atrium caused by water damage.

   

0744201

Replace Chilled Water Pump