UIHC Roy J. Carver Pavilion - Upgrade Elevators Banks E and EE

What's New

Final review meeting was held on June 2.

Final budget was approved at the June BOR meeting.

Much coordination has occurred to accommodate cath labs on 4th floor. The infection control/construction area was minimized so that there would be one week where the double door entry at EE would be reduced to a 4' width and there would be another 10 days period prior to 1/13/21 where the EE lobby will be closed. A temporary 4' door will be placed on the east end of the cath lab to provide an alternate route during this time and complete the work before Phase Two of the cath lab project closes down the east 1/2 of the area and this temporary access.

Project Number
0811501
Project Scope
Upgrade elevators in E Bank and EE Banks.
Project Status
Construction
Square Footage
0
Project Cost
$2,919,000.00
Construction Start Date
July 2020
Substantial Completion Date
December 2021
Awarded To
McComas Lacina Construction Company Incorporated
Architect(s)
Shive Hattery Incorporated