The University of Iowa

Iowa Memorial Union Improve Basement Condensate Piping

Project Number
0852501
Project Scope
Redesign the condensate drain piping for the air handling units (AHU) in the basement of the Iowa Memorial Union (IMU) in order to get proper condensate drainage from the AHU's steam coils.
Project Status
Construction
Square Footage
0
Project Cost
$267,500.00
Construction Start Date
April 2021
Substantial Completion Date
July 2021
Awarded To
Arc Mechanical Inc
Architect(s)
Design Engineers PC