Project Description
This project will cap and remove from service two Silurian wells located adjacent to Burge Hall. The wells are approximately 430 feet deep and will be abandoned in place. The well pumps, motors, column pipes, and associated controls, electrical wiring and conduit, piping, and valves will all be removed. Contractor will repair damage to sidewalk, street and landscaping. The City of Iowa City will remove one fire hydrant and abandon 6" water main and 10" water main. As part of this project, contractor will provide sidewalk repair and traffic control as required per the City's work. Work to take place summer 2022.
Project Number
0905601
Project Scope
Cap and remove from service two Silurian wells located adjacent to Burge Hall.
Project Status
Substantial Completion
Square Footage
0
Project Budget
$122,000.00
Construction Start Date
January 2022
Substantial Completion Date
July 2022
Awarded To
Northway Well And Pump Company
Architect(s)
Shive Hattery Incorporated