The University of Iowa

Spence Labs Spence Laboratories of Psychology - Repair AHU-B Drainage Issues

Project Number
0954201
Project Scope
This project will completely replace the drain pans, which would require the coils to be disconnected and removed from their current position. The top coil would need to be pulled out completely and the bottom coil would need to be raised or moved off the support stand. The unit could remain in operation through most of this work as there would be only intermittent cutting and soldering to disconnect and reconnect the coils, but the respective cold supply fan would be down while the coils are re
Project Status
Construction Close
Square Footage
2,059
Project Budget
$37,900.00
Construction Start Date
September 2022
Substantial Completion Date
December 2022
Awarded To
Winger Contracting Company
Architect(s)
Design Engineers PC