Oakdale Utility Power Plant - Oakdale Tower Pumps Improvements
Cistern piping replacement will require boring thru and under the roadway with a boring pit at the base of the retaining wall. The area will be accessible from both ends of the work zone but passage thru it will not be possible. Work is anticipated to take 1 week.
Area
30,663.49sq. ft.
Year built
1908
Ownership
Owned
Contact
Primary Building Coordinator:
Swearingen, Brad
Alternate Building Coordinators:
Bergerud, John
Bergerud, John
Hours
Monday: Arranged
Tuesday: Arranged
Wednesday: Arranged
Thursday: Arranged
Friday: Arranged
Saturday: Locked
Sunday: Locked
Tuesday: Arranged
Wednesday: Arranged
Thursday: Arranged
Friday: Arranged
Saturday: Locked
Sunday: Locked
Disclaimer Statement
Public operating hours for campus buildings are displayed, excluding holidays and special events. These hours do not represent office business hours. Access to buildings during closed hours is permitted via the Iowa One Card for approved faculty, staff, and students. For Hospital 24/7 entrances, visitor guidelines, and information, please visit the UI Health Care website.